To Advertise on this website, Contact us at admin@www.buonovino.com
Issues forwww.www.buonovino.com
- Loginorregisterto create an issue
- Statistics
- Advanced search
Summary | Status | Priority | Category | Last updated | Assigned to |
---|---|---|---|---|---|
different foundation support conditions of buildin | active | normal | support request | 49 weeks 6 days | |
wind load coeff. for intermediate walls. | active | normal | support request | 1 year 39 weeks | |
wind load coeff. for intermediate walls. | active | normal | support request | 1 year 39 weeks | |
wind load coeff. for intermediate walls. | active | normal | support request | 1 year 39 weeks | |
IRC SP 114 2018 | active | critical | support request | 1 year 41 weeks | |
STAAD亲苏PPORT DISPLACEMENT VALUE | active | normal | support request | 2 years 4 weeks | uct |
Slab Design | active | critical | task | 2 years 4 weeks | madhisefi |
Long Cantilever Beam Design | active | normal | support request | 2 years 4 weeks | aswarth_narayan |
Problem in Pile Foundation | active | critical | support request | 2 years 4 weeks | KannanBala |
street light pole foundation design | active | normal | support request | 2 years 4 weeks | |
culvert | active | normal | task | 3 years 1 week | |
Wind turbine foundation load | active | normal | support request | 3 years 4 weeks | |
Extension of GF floor slab and its connection | active | minor | support request | 3 years 15 weeks | vkaroshi |
Manual Design of column and Etab Column Design | active | normal | support request | 3 years 16 weeks | madhu.je |
Boundary Element Design In etabs Model | active | normal | support request | 3 years 41 weeks | Maulik Hothi |
Project thesis | active | normal | support request | 3 years 44 weeks | |
Research project topics | active | normal | support request | 3 years 45 weeks | Nakulkabra96 |
PEb footing excel shhet | active | critical | task | 3 years 47 weeks | |
STRUCTURAL DESIGN APPLICATION COURSE ONLINE TRAINI | active | normal | support request | 4 years 16 weeks | gururayarassociates |
Time requirement for Overhead Water Tank | active | normal | support request | 4 years 31 weeks | mainak.mallik |
Structural Design consultant company | active | normal | support request | 5 years 14 weeks | NEEL SHAH |
M.E Structural Engineering Project Topics | active | critical | support request | 5 years 16 weeks | Oppong_Goodenou... |
Composite construction | active | normal | support request | 5 years 21 weeks | arunkumark |
Left and Right Parts of the Menu are overriding | active | critical | bug report | 5 years 25 weeks | |
ULS check as per IS 1893-2014 (Part 4) | active | critical | support request | 5 years 51 weeks | siddubanagar |
slab design | active | normal | task | 6 years 2 weeks | yasin altay |
Torsional crack(ACI Code) | active | critical | task | 6 years 3 weeks | shailendra_rathore |
REQUST FOR STEEL DESIGN OF AN G+3 BUILDING , SOILC | active | normal | support request | 6 years 5 weeks | gande pranay sai |
Flat slab with shear connector | active | critical | support request | 6 years 9 weeks | arti24 |
Which type of staircase is preferable for frame st | active | normal | support request | 6 years 13 weeks | |
Design of single angle as per IS 800 and AISC 360- | active | normal | task | 6 years 19 weeks | |
Mtech project topics related to concrete | active | normal | feature request | 6 years 24 weeks | |
3.5.5 clause is 800 2007 ( about crane lumping mas | active | normal | feature request | 6 years 24 weeks | |
use of steel wraps in fibre Reinforced Concrete | active | critical | support request | 6年43周 | Chavanjai |
Slab Column Junction Concrete Grade | active | critical | support request | 6 years 45 weeks | sajjadzaheer |
Modelling in Staad pro | active | normal | feature request | 6 years 46 weeks | Nandy |
Regarding cooling tower on RCC | active | normal | task | 7 years 1 week | |
Blast Analysis | active | normal | support request | 7 years 23 weeks | priyatham |
Silo Design | active | critical | support request | 7 years 39 weeks | rahul_sharma |
Earth quake Provision in masonry structures | active | normal | task | 7 years 49 weeks | |
BUTTRESS RETAINING WALL | active | normal | task | 8 years 6 weeks | |
BUTTRESS RETAINING WALL | active | normal | task | 8 years 6 weeks | |
BUTTRESS RETAINING WALL | active | normal | task | 8 years 6 weeks | |
BUTTRESS RETAINING WALL | active | normal | task | 8 years 6 weeks | |
BUTTRESS RETAINING WALL | active | normal | task | 8 years 6 weeks | |
Design of combined footing for four randomly posit | active | normal | task | 8 years 9 weeks | |
Design of steel beam and column as per IS800-2007 | active | normal | support request | 8 years 14 weeks | aditya_pradhan |
Requisition for Questionnaire Reply-Reg Date:22/1 | active | critical | support request | 8 years 14 weeks | sharmila_saravanan |
QUERRY ON WATER TANK FEM RESULTS OF STAAD | active | critical | support request | 8 years 16 weeks | vilas.bhuwad88 |
Allowable stresses in bent re-bars | active | normal | support request | 8 years 19 weeks | Hasmagnolia |