To Advertise on this website, Contact us at admin@www.buonovino.com
Issues forwww.www.buonovino.com
- Loginorregisterto create an issue
- Statistics
- Advanced search
Summary | Status | Priority | Category | Last updated | Assigned to |
---|---|---|---|---|---|
regarding ms (structural engineering) in UK | active | critical | support request | 11 years 9 weeks | abh12hekyadav |
Design of steel beam and column as per IS800-2007 | active | normal | support request | 8 years 14 weeks | aditya_pradhan |
Results of Raft | active | normal | support request | 11 years 18 weeks | Ajay kumar jha |
Design of large Cantilevers in seismic zone Iv and | active | normal | support request | 14 years 6 weeks | ajay1804 |
whether footings behave like rigid or a flexible? | active | normal | support request | 12 years 34 weeks | ajeet_08 |
Bending Moment Diagram in Staad for Seismic Load c | active | normal | support request | 14 years 2 weeks | ambrish |
References, Sample calculations & links for substa | active | critical | support request | 10 years 47 weeks | Amit.Mistry |
core test jistification | active | normal | support request | 14 years 10 weeks | anil102 |
Structural Status Investigations for Mullai Periya | active | critical | feature request | 10 years 51 weeks | anitech |
base pressure in STAAD | active | critical | support request | 13 years 12 weeks | |
Shear centre of the close box girder | active | critical | support request | 13 years 7 weeks | |
在软件教派中失效链接ion | active | critical | bug report | 11 years 23 weeks | |
Lower soil N-value | active | normal | support request | 10 years 43 weeks | |
load combinations | active | normal | feature request | 10 years 2 weeks | |
Comparative study of typical R.C. building using I | active | normal | support request | 9 years 32 weeks | |
BUTTRESS RETAINING WALL | active | normal | task | 8 years 6 weeks | |
BUTTRESS RETAINING WALL | active | normal | task | 8 years 6 weeks | |
PEb footing excel shhet | active | critical | task | 3 years 47 weeks | |
3.5.5 clause is 800 2007 ( about crane lumping mas | active | normal | feature request | 6 years 24 weeks | |
wind load coeff. for intermediate walls. | active | normal | support request | 1 year 39 weeks | |
Shear centre of the close box girder | active | critical | support request | 13 years 7 weeks | |
Analysis and design of Sloping slab and beam | active | normal | support request | 12 years 44 weeks | |
International Oppertunities for Structural Enginee | active | normal | task | 11 years 46 weeks | |
sloped Roof reinforcement details...! | active | normal | feature request | 11 years 41 weeks | |
Chimney designing and steps to be followed to fin | active | critical | task | 11 years 6 weeks | |
street light pole foundation design | active | normal | support request | 2 years 4 weeks | |
wind shelds design concept | active | critical | support request | 8 years 48 weeks | |
International Conference | active | normal | task | 8 years 24 weeks | |
Design of combined footing for four randomly posit | active | normal | task | 8 years 9 weeks | |
BUTTRESS RETAINING WALL | active | normal | task | 8 years 6 weeks | |
Which type of staircase is preferable for frame st | active | normal | support request | 6 years 13 weeks | |
Project thesis | active | normal | support request | 3 years 44 weeks | |
culvert | active | normal | task | 3 years 1 week | |
IRC SP 114 2018 | active | critical | support request | 1 year 41 weeks | |
different foundation support conditions of buildin | active | normal | support request | 49 weeks 6 days | |
Ten Tips for Evaluating a Home Builder | active | normal | task | 13 years 12 weeks | |
i need dridges construction tasks for primavera | active | normal | support request | 13 years 8 weeks | |
PhD | active | normal | support request | 12 years 26 weeks | |
Sensitivity of PUSHOVER Analysis to Design Paramet | active | normal | task | 11 years 11 weeks | |
IS code | active | normal | feature request | 10 years 35 weeks | |
Smart Google Search Tips - "Tall building" | active | normal | task | 10 years 24 weeks | |
Design of RCC blast resistant Structure | active | critical | support request | 9 years 50 weeks | |
如何减少结构的挠度下吗 | active | normal | support request | 9 years 48 weeks | |
BUTTRESS RETAINING WALL | active | normal | task | 8 years 6 weeks | |
Design of single angle as per IS 800 and AISC 360- | active | normal | task | 6 years 19 weeks | |
Left and Right Parts of the Menu are overriding | active | critical | bug report | 5 years 25 weeks | |
Wind turbine foundation load | active | normal | support request | 3 years 4 weeks | |
wind load coeff. for intermediate walls. | active | normal | support request | 1 year 39 weeks | |
Equiping self | active | normal | task | 12 years 9 weeks | |
adapt building | active | normal | support request | 12 years 8 min | |